[[["易于理解","easyToUnderstand","thumb-up"],["解决了我的问题","solvedMyProblem","thumb-up"],["其他","otherUp","thumb-up"]],[["很难理解","hardToUnderstand","thumb-down"],["信息或示例代码不正确","incorrectInformationOrSampleCode","thumb-down"],["没有我需要的信息/示例","missingTheInformationSamplesINeed","thumb-down"],["翻译问题","translationIssue","thumb-down"],["其他","otherDown","thumb-down"]],["最后更新时间 (UTC):2025-03-12。"],[[["This documentation refers to Apigee hybrid version 1.7, which is no longer supported and requires an upgrade to a newer version."],["Installing Apigee hybrid involves first initializing the deployment services and then applying the Apigee-specific runtime components to the cluster."],["A dry run is recommended before both initialization and application to identify potential errors without making any changes."],["The status of the deployment can be monitored by using the `apigeectl check-ready` command and by checking the pod status in both the `apigee-system` and `istio-system` namespaces."]]],[]]