[[["容易理解","easyToUnderstand","thumb-up"],["確實解決了我的問題","solvedMyProblem","thumb-up"],["其他","otherUp","thumb-up"]],[["難以理解","hardToUnderstand","thumb-down"],["資訊或程式碼範例有誤","incorrectInformationOrSampleCode","thumb-down"],["缺少我需要的資訊/範例","missingTheInformationSamplesINeed","thumb-down"],["翻譯問題","translationIssue","thumb-down"],["其他","otherDown","thumb-down"]],["上次更新時間:2025-09-04 (世界標準時間)。"],[],[],null,["# Conduct disaster recovery testing\n\nIf you have a robust and well-tested disaster recovery (DR) strategy, you can\nminimize the impact of disruptions, achieve faster recovery times, and resume\ncore operations more rapidly when things go wrong.\n\nYour DR strategy should include detailed emergency response requirements, backup\noperations, and recovery procedures.\n\n1. **One to three months before your event**, make sure to run through\n simulations of disaster scenarios to identify any gaps in your DR plans and\n readiness.\n\n2. After each test, evaluate the results to determine if any architectural\n changes are required. Review and optimize resources as needed. For more\n information, see\n [Optimize your cloud resources](/support/docs/peak-events/optimize-resources).\n\nYour account team or Technical Account Manager can help you with your DR testing,\nas well as how to understand and improve your incident response process. For\nmore information, see the\n[Disaster recovery planning guide](/architecture/dr-scenarios-planning-guide)."]]