- 2.55.0 (latest)
- 2.54.0
- 2.53.0
- 2.51.0
- 2.50.0
- 2.49.0
- 2.48.0
- 2.47.0
- 2.46.0
- 2.45.0
- 2.44.0
- 2.43.0
- 2.42.0
- 2.41.0
- 2.39.0
- 2.38.0
- 2.37.0
- 2.36.0
- 2.35.0
- 2.34.0
- 2.33.0
- 2.32.0
- 2.31.0
- 2.30.0
- 2.29.0
- 2.26.0
- 2.25.0
- 2.24.0
- 2.23.0
- 2.22.0
- 2.21.0
- 2.20.0
- 2.19.0
- 2.18.0
- 2.17.0
- 2.16.0
- 2.15.0
- 2.14.0
- 2.13.0
- 2.11.0
- 2.10.0
- 2.9.0
- 2.8.0
- 2.7.0
- 2.6.0
- 2.5.6
- 2.4.3
- 2.3.2
public static interface PatchJobs.PatchRolloutOrBuilder extends MessageOrBuilder
Implements
MessageOrBuilderMethods
getDisruptionBudget()
public abstract Common.FixedOrPercent getDisruptionBudget()
The maximum number (or percentage) of VMs per zone to disrupt at any given
moment. The number of VMs calculated from multiplying the percentage by the
total number of VMs in a zone is rounded up.
During patching, a VM is considered disrupted from the time the agent is
notified to begin until patching has completed. This disruption time
includes the time to complete reboot and any post-patch steps.
A VM contributes to the disruption budget if its patching operation fails
either when applying the patches, running pre or post patch steps, or if it
fails to respond with a success notification before timing out. VMs that
are not running or do not have an active agent do not count toward this
disruption budget.
For zone-by-zone rollouts, if the disruption budget in a zone is exceeded,
the patch job stops, because continuing to the next zone requires
completion of the patch process in the previous zone.
For example, if the disruption budget has a fixed value of 10
, and 8 VMs
fail to patch in the current zone, the patch job continues to patch 2 VMs
at a time until the zone is completed. When that zone is completed
successfully, patching begins with 10 VMs at a time in the next zone. If 10
VMs in the next zone fail to patch, the patch job stops.
.google.cloud.osconfig.v1beta.FixedOrPercent disruption_budget = 2;
Returns | |
---|---|
Type | Description |
Common.FixedOrPercent | The disruptionBudget. |
getDisruptionBudgetOrBuilder()
public abstract Common.FixedOrPercentOrBuilder getDisruptionBudgetOrBuilder()
The maximum number (or percentage) of VMs per zone to disrupt at any given
moment. The number of VMs calculated from multiplying the percentage by the
total number of VMs in a zone is rounded up.
During patching, a VM is considered disrupted from the time the agent is
notified to begin until patching has completed. This disruption time
includes the time to complete reboot and any post-patch steps.
A VM contributes to the disruption budget if its patching operation fails
either when applying the patches, running pre or post patch steps, or if it
fails to respond with a success notification before timing out. VMs that
are not running or do not have an active agent do not count toward this
disruption budget.
For zone-by-zone rollouts, if the disruption budget in a zone is exceeded,
the patch job stops, because continuing to the next zone requires
completion of the patch process in the previous zone.
For example, if the disruption budget has a fixed value of 10
, and 8 VMs
fail to patch in the current zone, the patch job continues to patch 2 VMs
at a time until the zone is completed. When that zone is completed
successfully, patching begins with 10 VMs at a time in the next zone. If 10
VMs in the next zone fail to patch, the patch job stops.
.google.cloud.osconfig.v1beta.FixedOrPercent disruption_budget = 2;
Returns | |
---|---|
Type | Description |
Common.FixedOrPercentOrBuilder |
getMode()
public abstract PatchJobs.PatchRollout.Mode getMode()
Mode of the patch rollout.
.google.cloud.osconfig.v1beta.PatchRollout.Mode mode = 1;
Returns | |
---|---|
Type | Description |
PatchJobs.PatchRollout.Mode | The mode. |
getModeValue()
public abstract int getModeValue()
Mode of the patch rollout.
.google.cloud.osconfig.v1beta.PatchRollout.Mode mode = 1;
Returns | |
---|---|
Type | Description |
int | The enum numeric value on the wire for mode. |
hasDisruptionBudget()
public abstract boolean hasDisruptionBudget()
The maximum number (or percentage) of VMs per zone to disrupt at any given
moment. The number of VMs calculated from multiplying the percentage by the
total number of VMs in a zone is rounded up.
During patching, a VM is considered disrupted from the time the agent is
notified to begin until patching has completed. This disruption time
includes the time to complete reboot and any post-patch steps.
A VM contributes to the disruption budget if its patching operation fails
either when applying the patches, running pre or post patch steps, or if it
fails to respond with a success notification before timing out. VMs that
are not running or do not have an active agent do not count toward this
disruption budget.
For zone-by-zone rollouts, if the disruption budget in a zone is exceeded,
the patch job stops, because continuing to the next zone requires
completion of the patch process in the previous zone.
For example, if the disruption budget has a fixed value of 10
, and 8 VMs
fail to patch in the current zone, the patch job continues to patch 2 VMs
at a time until the zone is completed. When that zone is completed
successfully, patching begins with 10 VMs at a time in the next zone. If 10
VMs in the next zone fail to patch, the patch job stops.
.google.cloud.osconfig.v1beta.FixedOrPercent disruption_budget = 2;
Returns | |
---|---|
Type | Description |
boolean | Whether the disruptionBudget field is set. |