- 1.52.0 (latest)
- 1.51.0
- 1.50.0
- 1.49.0
- 1.47.0
- 1.46.0
- 1.45.0
- 1.44.0
- 1.43.0
- 1.42.0
- 1.41.0
- 1.40.0
- 1.39.0
- 1.38.0
- 1.37.0
- 1.35.0
- 1.34.0
- 1.33.0
- 1.32.0
- 1.31.0
- 1.30.0
- 1.29.0
- 1.28.0
- 1.27.0
- 1.26.0
- 1.25.0
- 1.22.0
- 1.21.0
- 1.20.0
- 1.19.0
- 1.18.0
- 1.17.0
- 1.16.0
- 1.15.0
- 1.14.0
- 1.13.0
- 1.12.0
- 1.11.0
- 1.10.0
- 1.9.0
- 1.7.0
- 1.6.0
- 1.5.0
- 1.4.0
- 1.3.0
- 1.2.0
- 1.1.14
- 0.1.2
public interface TimeWindowOrBuilder extends MessageOrBuilder
Implements
MessageOrBuilderMethods
getCostPerHourAfterSoftEndTime()
public abstract double getCostPerHourAfterSoftEndTime()
A cost per hour added to other costs in the model if the event occurs after
soft_end_time
, computed as:
`
max(0, t.seconds - soft_end_time.seconds)
- cost_per_hour_after_soft_end_time / 3600, t being the time of the event.
This cost must be positive, and the field can only be set if
soft_end_time` has been set.
optional double cost_per_hour_after_soft_end_time = 6;
Type | Description |
double | The costPerHourAfterSoftEndTime. |
getCostPerHourBeforeSoftStartTime()
public abstract double getCostPerHourBeforeSoftStartTime()
A cost per hour added to other costs in the model if the event occurs
before soft_start_time, computed as:
`
max(0, soft_start_time - t.seconds)
- cost_per_hour_before_soft_start_time / 3600, t being the time of the event.
optional double cost_per_hour_before_soft_start_time = 5;
Type | Description |
double | The costPerHourBeforeSoftStartTime. |
getEndTime()
public abstract Timestamp getEndTime()
The hard time window end time. If unspecified it will be set to
ShipmentModel.global_end_time
.
.google.protobuf.Timestamp end_time = 2;
Type | Description |
Timestamp | The endTime. |
getEndTimeOrBuilder()
public abstract TimestampOrBuilder getEndTimeOrBuilder()
The hard time window end time. If unspecified it will be set to
ShipmentModel.global_end_time
.
.google.protobuf.Timestamp end_time = 2;
Type | Description |
TimestampOrBuilder |
getSoftEndTime()
public abstract Timestamp getSoftEndTime()
The soft end time of the time window.
.google.protobuf.Timestamp soft_end_time = 4;
Type | Description |
Timestamp | The softEndTime. |
getSoftEndTimeOrBuilder()
public abstract TimestampOrBuilder getSoftEndTimeOrBuilder()
The soft end time of the time window.
.google.protobuf.Timestamp soft_end_time = 4;
Type | Description |
TimestampOrBuilder |
getSoftStartTime()
public abstract Timestamp getSoftStartTime()
The soft start time of the time window.
.google.protobuf.Timestamp soft_start_time = 3;
Type | Description |
Timestamp | The softStartTime. |
getSoftStartTimeOrBuilder()
public abstract TimestampOrBuilder getSoftStartTimeOrBuilder()
The soft start time of the time window.
.google.protobuf.Timestamp soft_start_time = 3;
Type | Description |
TimestampOrBuilder |
getStartTime()
public abstract Timestamp getStartTime()
The hard time window start time. If unspecified it will be set to
ShipmentModel.global_start_time
.
.google.protobuf.Timestamp start_time = 1;
Type | Description |
Timestamp | The startTime. |
getStartTimeOrBuilder()
public abstract TimestampOrBuilder getStartTimeOrBuilder()
The hard time window start time. If unspecified it will be set to
ShipmentModel.global_start_time
.
.google.protobuf.Timestamp start_time = 1;
Type | Description |
TimestampOrBuilder |
hasCostPerHourAfterSoftEndTime()
public abstract boolean hasCostPerHourAfterSoftEndTime()
A cost per hour added to other costs in the model if the event occurs after
soft_end_time
, computed as:
`
max(0, t.seconds - soft_end_time.seconds)
- cost_per_hour_after_soft_end_time / 3600, t being the time of the event.
This cost must be positive, and the field can only be set if
soft_end_time` has been set.
optional double cost_per_hour_after_soft_end_time = 6;
Type | Description |
boolean | Whether the costPerHourAfterSoftEndTime field is set. |
hasCostPerHourBeforeSoftStartTime()
public abstract boolean hasCostPerHourBeforeSoftStartTime()
A cost per hour added to other costs in the model if the event occurs
before soft_start_time, computed as:
`
max(0, soft_start_time - t.seconds)
- cost_per_hour_before_soft_start_time / 3600, t being the time of the event.
optional double cost_per_hour_before_soft_start_time = 5;
Type | Description |
boolean | Whether the costPerHourBeforeSoftStartTime field is set. |
hasEndTime()
public abstract boolean hasEndTime()
The hard time window end time. If unspecified it will be set to
ShipmentModel.global_end_time
.
.google.protobuf.Timestamp end_time = 2;
Type | Description |
boolean | Whether the endTime field is set. |
hasSoftEndTime()
public abstract boolean hasSoftEndTime()
The soft end time of the time window.
.google.protobuf.Timestamp soft_end_time = 4;
Type | Description |
boolean | Whether the softEndTime field is set. |
hasSoftStartTime()
public abstract boolean hasSoftStartTime()
The soft start time of the time window.
.google.protobuf.Timestamp soft_start_time = 3;
Type | Description |
boolean | Whether the softStartTime field is set. |
hasStartTime()
public abstract boolean hasStartTime()
The hard time window start time. If unspecified it will be set to
ShipmentModel.global_start_time
.
.google.protobuf.Timestamp start_time = 1;
Type | Description |
boolean | Whether the startTime field is set. |