- 0.66.0 (latest)
- 0.65.0
- 0.64.0
- 0.63.0
- 0.62.0
- 0.60.0
- 0.59.0
- 0.58.0
- 0.57.0
- 0.56.0
- 0.55.0
- 0.54.0
- 0.53.0
- 0.52.0
- 0.51.0
- 0.50.0
- 0.48.0
- 0.47.0
- 0.46.0
- 0.45.0
- 0.44.0
- 0.43.0
- 0.42.0
- 0.41.0
- 0.40.0
- 0.39.0
- 0.38.0
- 0.35.0
- 0.34.0
- 0.33.0
- 0.32.0
- 0.31.0
- 0.30.0
- 0.29.0
- 0.28.0
- 0.27.0
- 0.26.0
- 0.25.0
- 0.24.0
- 0.23.0
- 0.22.0
- 0.21.0
- 0.20.0
- 0.19.0
- 0.18.0
- 0.17.0
- 0.16.0
- 0.15.0
public interface CohortsRangeOrBuilder extends MessageOrBuilder
Implements
MessageOrBuilderMethods
getEndOffset()
public abstract int getEndOffset()
Required. endOffset
specifies the end date of the extended reporting date
range for a cohort report. endOffset
can be any positive integer but is
commonly set to 5 to 10 so that reports contain data on the cohort for the
next several granularity time periods.
If granularity
is DAILY
, the endDate
of the extended reporting date
range is endDate
of the cohort plus endOffset
days.
If granularity
is WEEKLY
, the endDate
of the extended reporting date
range is endDate
of the cohort plus endOffset * 7
days.
If granularity
is MONTHLY
, the endDate
of the extended reporting date
range is endDate
of the cohort plus endOffset * 30
days.
int32 end_offset = 3;
Type | Description |
int | The endOffset. |
getGranularity()
public abstract CohortsRange.Granularity getGranularity()
Required. The granularity used to interpret the startOffset
and
endOffset
for the extended reporting date range for a cohort report.
.google.analytics.data.v1beta.CohortsRange.Granularity granularity = 1;
Type | Description |
CohortsRange.Granularity | The granularity. |
getGranularityValue()
public abstract int getGranularityValue()
Required. The granularity used to interpret the startOffset
and
endOffset
for the extended reporting date range for a cohort report.
.google.analytics.data.v1beta.CohortsRange.Granularity granularity = 1;
Type | Description |
int | The enum numeric value on the wire for granularity. |
getStartOffset()
public abstract int getStartOffset()
startOffset
specifies the start date of the extended reporting date range
for a cohort report. startOffset
is commonly set to 0 so that reports
contain data from the acquisition of the cohort forward.
If granularity
is DAILY
, the startDate
of the extended reporting date
range is startDate
of the cohort plus startOffset
days.
If granularity
is WEEKLY
, the startDate
of the extended reporting
date range is startDate
of the cohort plus startOffset * 7
days.
If granularity
is MONTHLY
, the startDate
of the extended reporting
date range is startDate
of the cohort plus startOffset * 30
days.
int32 start_offset = 2;
Type | Description |
int | The startOffset. |