Class WeekDayOfMonth (1.11.2)

WeekDayOfMonth(mapping=None, *, ignore_unknown_fields=False, **kwargs)

Represents one week day in a month. An example is "the 4th Sunday".

Attributes

NameDescription
week_ordinal int
Required. Week number in a month. 1-4 indicates the 1st to 4th week of the month. -1 indicates the last week of the month.
day_of_week google.type.dayofweek_pb2.DayOfWeek
Required. A day of the week.
day_offset int
Optional. Represents the number of days before or after the given week day of month that the patch deployment is scheduled for. For example if week_ordinal and day_of_week values point to the second day of the month and this day_offset value is set to 3, the patch deployment takes place three days after the second Tuesday of the month. If this value is negative, for example -5, the patches are deployed five days before before the second Tuesday of the month. Allowed values are in range [-30, 30].