Class FlexResourceSchedulingGoal (0.8.1)

FlexResourceSchedulingGoal(value)

Specifies the resource to optimize for in Flexible Resource Scheduling.

Values: FLEXRS_UNSPECIFIED (0): Run in the default mode. FLEXRS_SPEED_OPTIMIZED (1): Optimize for lower execution time. FLEXRS_COST_OPTIMIZED (2): Optimize for lower cost.