Class ListBudgetsRequest (1.14.3)

ListBudgetsRequest(mapping=None, *, ignore_unknown_fields=False, **kwargs)

Request for ListBudgets

Attributes

NameDescription
parent str
Required. Name of billing account to list budgets under. Values are of the form billingAccounts/{billingAccountId}.
scope str
Optional. Set the scope of the budgets to be returned, in the format of the resource name. The scope of a budget is the cost that it tracks, such as costs for a single project, or the costs for all projects in a folder. Only project scope (in the format of "projects/project-id" or "projects/123") is supported in this field. When this field is set to a project's resource name, the budgets returned are tracking the costs for that project.
page_size int
Optional. The maximum number of budgets to return per page. The default and maximum value are 100.
page_token str
Optional. The value returned by the last ListBudgetsResponse which indicates that this is a continuation of a prior ListBudgets call, and that the system should return the next page of data.