Reference documentation and code samples for the Google Cloud OsConfig V1 Client class WeekDayOfMonth.
Represents one week day in a month. An example is "the 4th Sunday".
Generated from protobuf message google.cloud.osconfig.v1.WeekDayOfMonth
Namespace
Google \ Cloud \ OsConfig \ V1Methods
__construct
Constructor.
Parameters | |
---|---|
Name | Description |
data |
array
Optional. Data for populating the Message object. |
↳ week_ordinal |
int
Required. Week number in a month. 1-4 indicates the 1st to 4th week of the month. -1 indicates the last week of the month. |
↳ day_of_week |
int
Required. A day of the week. |
↳ day_offset |
int
Optional. Represents the number of days before or after the given week day of month that the patch deployment is scheduled for. For example if |
getWeekOrdinal
Required. Week number in a month. 1-4 indicates the 1st to 4th week of the month. -1 indicates the last week of the month.
Returns | |
---|---|
Type | Description |
int |
setWeekOrdinal
Required. Week number in a month. 1-4 indicates the 1st to 4th week of the month. -1 indicates the last week of the month.
Parameter | |
---|---|
Name | Description |
var |
int
|
Returns | |
---|---|
Type | Description |
$this |
getDayOfWeek
Required. A day of the week.
Returns | |
---|---|
Type | Description |
int |
setDayOfWeek
Required. A day of the week.
Parameter | |
---|---|
Name | Description |
var |
int
|
Returns | |
---|---|
Type | Description |
$this |
getDayOffset
Optional. Represents the number of days before or after the given week day
of month that the patch deployment is scheduled for. For example if
week_ordinal
and day_of_week
values point to the second day of the
month and this day_offset
value is set to 3
, the patch deployment takes
place three days after the second Tuesday of the month. If this value is
negative, for example -5, the patches are deployed five days before before
the second Tuesday of the month. Allowed values are in range [-30, 30].
Returns | |
---|---|
Type | Description |
int |
setDayOffset
Optional. Represents the number of days before or after the given week day
of month that the patch deployment is scheduled for. For example if
week_ordinal
and day_of_week
values point to the second day of the
month and this day_offset
value is set to 3
, the patch deployment takes
place three days after the second Tuesday of the month. If this value is
negative, for example -5, the patches are deployed five days before before
the second Tuesday of the month. Allowed values are in range [-30, 30].
Parameter | |
---|---|
Name | Description |
var |
int
|
Returns | |
---|---|
Type | Description |
$this |