public static interface Report.DateRange.FixedDateRangeOrBuilder extends MessageOrBuilderImplements
MessageOrBuilderMethods
getEndDate()
public abstract Date getEndDate()Required. The end date (inclusive) of this date range.
.google.type.Date end_date = 2 [(.google.api.field_behavior) = REQUIRED];
| Returns | |
|---|---|
| Type | Description |
com.google.type.Date |
The endDate. |
getEndDateOrBuilder()
public abstract DateOrBuilder getEndDateOrBuilder()Required. The end date (inclusive) of this date range.
.google.type.Date end_date = 2 [(.google.api.field_behavior) = REQUIRED];
| Returns | |
|---|---|
| Type | Description |
com.google.type.DateOrBuilder |
|
getStartDate()
public abstract Date getStartDate()Required. The start date of this date range.
.google.type.Date start_date = 1 [(.google.api.field_behavior) = REQUIRED];
| Returns | |
|---|---|
| Type | Description |
com.google.type.Date |
The startDate. |
getStartDateOrBuilder()
public abstract DateOrBuilder getStartDateOrBuilder()Required. The start date of this date range.
.google.type.Date start_date = 1 [(.google.api.field_behavior) = REQUIRED];
| Returns | |
|---|---|
| Type | Description |
com.google.type.DateOrBuilder |
|
hasEndDate()
public abstract boolean hasEndDate()Required. The end date (inclusive) of this date range.
.google.type.Date end_date = 2 [(.google.api.field_behavior) = REQUIRED];
| Returns | |
|---|---|
| Type | Description |
boolean |
Whether the endDate field is set. |
hasStartDate()
public abstract boolean hasStartDate()Required. The start date of this date range.
.google.type.Date start_date = 1 [(.google.api.field_behavior) = REQUIRED];
| Returns | |
|---|---|
| Type | Description |
boolean |
Whether the startDate field is set. |