[[["わかりやすい","easyToUnderstand","thumb-up"],["問題の解決に役立った","solvedMyProblem","thumb-up"],["その他","otherUp","thumb-up"]],[["わかりにくい","hardToUnderstand","thumb-down"],["情報またはサンプルコードが不正確","incorrectInformationOrSampleCode","thumb-down"],["必要な情報 / サンプルがない","missingTheInformationSamplesINeed","thumb-down"],["翻訳に関する問題","translationIssue","thumb-down"],["その他","otherDown","thumb-down"]],["最終更新日 2025-09-05 UTC。"],[[["\u003cp\u003ePromotion disconnects the destination Cloud SQL instance from the source, transforming it from a replica to a primary instance.\u003c/p\u003e\n"],["\u003cp\u003eFor continuous migrations, promotion should occur after shifting reads and writes to the destination, while one-time migrations are ready for use immediately after the dump and load process is complete.\u003c/p\u003e\n"],["\u003cp\u003eTo prevent data loss, halt all writes to the source database and confirm the replication delay is at zero before initiating promotion.\u003c/p\u003e\n"],["\u003cp\u003eDuring promotion, the migration job ceases reading from the source, and once completed, the destination instance becomes the primary, writeable instance.\u003c/p\u003e\n"],["\u003cp\u003ePromoting failed or manually stopped migration jobs in the CDC phase can lead to data inconsistencies between the source and destination databases.\u003c/p\u003e\n"]]],[],null,["# Promote a migration\n\n\u003cbr /\u003e\n\n\u003cbr /\u003e\n\nMySQL \\| [PostgreSQL](/database-migration/docs/postgres/promote-migration \"View this page for the PostgreSQL version of Database Migration Service.\") \\| [PostgreSQL to AlloyDB](/database-migration/docs/postgresql-to-alloydb/promote-migration \"View this page for the PostgreSQL to AlloyDB version of Database Migration Service.\")\n\n\u003cbr /\u003e\n\n\u003cbr /\u003e\n\n\u003cbr /\u003e\n\n\u003cbr /\u003e\n\n\nPromotion means that the destination Cloud SQL instance is disconnected from\nthe source, and is promoted from a replica instance to a primary instance.\n\n\nFor continuous migrations, you can initiate the promotion process\nafter it's time to move reads and writes to the destination.\nFor one-time migrations, the Cloud SQL instance is ready as soon as the dump and load is complete, and user-invoked promotion isn't required.\n\nTo promote a migration without loss of information, follow these steps:\n\n1. Go to the [Migration jobs](https://console.cloud.google.com/dbmigration/migrations) page.\n2. Click the migration job that represents the migration that you want to promote. The **Migration job details** page appears.\n\n3. After the full dump phase has completed and the migration job is in CDC phase, the option for promotion is available.\n4. Immediately after transitioning to the CDC phase, depending on the size of the dump, there may be a long replication delay because the Cloud SQL destination instance catches up on changes that occurred during the dump and\n load.\n\n Wait for the replication delay to trend down significantly, ideally on the\n order of minutes or seconds. The replication delay is available for review on\n the migration job page.\n5. After the replication delay is at a minimum, you can initiate the promotion. To avoid data loss, make sure to:\n 1. **Stop all writes, running scripts, and client connections to the source\n database**. The downtime period begins here.\n 2. Wait until the replication delay is at zero, which means that the migration job has processed all outstanding changes.\n\n | You can promote a migration even if the replication delay isn't at zero. This can reduce the database downtime, but may affect the accuracy of the data in the destination.\n6. In the **Migration job details** page, click **Promote**.\n7. In the **Promote migration job?** window, click **Promote**.\n8. The migration job stops reading from the source and the substatus is `Promote in progress`. At this point, you cannot stop or undo the promotion process.\n9. The destination instance is promoted to a primary writeable instance. The migration job status is `Completed`.\n10. The application can now be connected to the Cloud SQL instance and the migration job can be safely deleted.\n\nThe following behaviors can occur during a promotion:\n\n\u003cbr /\u003e\n\n- When you promote migration jobs that have failed or were manually stopped during CDC phase, data on the source and the destination can be inconsistent.\n- Promotion enables [point-in-time recovery (PITR)](/sql/docs/mysql/backup-recovery/restore#tips-pitr) on migrated instances, which can take the promotion process longer to complete."]]