Reference documentation and code samples for the Google Cloud OsConfig V1 Client class WeekDayOfMonth.
Represents one week day in a month. An example is "the 4th Sunday".
Generated from protobuf message google.cloud.osconfig.v1.WeekDayOfMonth
Namespace
Google \ Cloud \ OsConfig \ V1
Methods
__construct
Constructor.
Parameters
Name
Description
data
array
Optional. Data for populating the Message object.
↳ week_ordinal
int
Required. Week number in a month. 1-4 indicates the 1st to 4th week of the month. -1 indicates the last week of the month.
↳ day_of_week
int
Required. A day of the week.
↳ day_offset
int
Optional. Represents the number of days before or after the given week day of month that the patch deployment is scheduled for. For example if week_ordinal and day_of_week values point to the second day of the month and this day_offset value is set to 3, the patch deployment takes place three days after the second Tuesday of the month. If this value is negative, for example -5, the patches are deployed five days before before the second Tuesday of the month. Allowed values are in range [-30, 30].
getWeekOrdinal
Required. Week number in a month. 1-4 indicates the 1st to 4th week of the
month. -1 indicates the last week of the month.
Returns
Type
Description
int
setWeekOrdinal
Required. Week number in a month. 1-4 indicates the 1st to 4th week of the
month. -1 indicates the last week of the month.
Parameter
Name
Description
var
int
Returns
Type
Description
$this
getDayOfWeek
Required. A day of the week.
Returns
Type
Description
int
Enum of type DayOfWeek.
setDayOfWeek
Required. A day of the week.
Parameter
Name
Description
var
int
Enum of type DayOfWeek.
Returns
Type
Description
$this
getDayOffset
Optional. Represents the number of days before or after the given week day
of month that the patch deployment is scheduled for. For example if
week_ordinal and day_of_week values point to the second day of the
month and this day_offset value is set to 3, the patch deployment takes
place three days after the second Tuesday of the month. If this value is
negative, for example -5, the patches are deployed five days before before
the second Tuesday of the month. Allowed values are in range [-30, 30].
Returns
Type
Description
int
setDayOffset
Optional. Represents the number of days before or after the given week day
of month that the patch deployment is scheduled for. For example if
week_ordinal and day_of_week values point to the second day of the
month and this day_offset value is set to 3, the patch deployment takes
place three days after the second Tuesday of the month. If this value is
negative, for example -5, the patches are deployed five days before before
the second Tuesday of the month. Allowed values are in range [-30, 30].
[[["Easy to understand","easyToUnderstand","thumb-up"],["Solved my problem","solvedMyProblem","thumb-up"],["Other","otherUp","thumb-up"]],[["Hard to understand","hardToUnderstand","thumb-down"],["Incorrect information or sample code","incorrectInformationOrSampleCode","thumb-down"],["Missing the information/samples I need","missingTheInformationSamplesINeed","thumb-down"],["Other","otherDown","thumb-down"]],["Last updated 2025-09-09 UTC."],[],[],null,["# Google Cloud OsConfig V1 Client - Class WeekDayOfMonth (2.1.0)\n\nVersion latestkeyboard_arrow_down\n\n- [2.1.0 (latest)](/php/docs/reference/cloud-osconfig/latest/V1.WeekDayOfMonth)\n- [2.0.5](/php/docs/reference/cloud-osconfig/2.0.5/V1.WeekDayOfMonth)\n- [1.3.5](/php/docs/reference/cloud-osconfig/1.3.5/V1.WeekDayOfMonth)\n- [1.2.2](/php/docs/reference/cloud-osconfig/1.2.2/V1.WeekDayOfMonth)\n- [1.1.1](/php/docs/reference/cloud-osconfig/1.1.1/V1.WeekDayOfMonth)\n- [1.0.5](/php/docs/reference/cloud-osconfig/1.0.5/V1.WeekDayOfMonth) \nReference documentation and code samples for the Google Cloud OsConfig V1 Client class WeekDayOfMonth.\n\nRepresents one week day in a month. An example is \"the 4th Sunday\".\n\nGenerated from protobuf message `google.cloud.osconfig.v1.WeekDayOfMonth`\n\nNamespace\n---------\n\nGoogle \\\\ Cloud \\\\ OsConfig \\\\ V1\n\nMethods\n-------\n\n### __construct\n\nConstructor.\n\n### getWeekOrdinal\n\nRequired. Week number in a month. 1-4 indicates the 1st to 4th week of the\nmonth. -1 indicates the last week of the month.\n\n### setWeekOrdinal\n\nRequired. Week number in a month. 1-4 indicates the 1st to 4th week of the\nmonth. -1 indicates the last week of the month.\n\n### getDayOfWeek\n\nRequired. A day of the week.\n\n### setDayOfWeek\n\nRequired. A day of the week.\n\n### getDayOffset\n\nOptional. Represents the number of days before or after the given week day\nof month that the patch deployment is scheduled for. For example if\n`week_ordinal` and `day_of_week` values point to the second day of the\nmonth and this `day_offset` value is set to `3`, the patch deployment takes\nplace three days after the second Tuesday of the month. If this value is\nnegative, for example -5, the patches are deployed five days before before\nthe second Tuesday of the month. Allowed values are in range \\[-30, 30\\].\n\n### setDayOffset\n\nOptional. Represents the number of days before or after the given week day\nof month that the patch deployment is scheduled for. For example if\n`week_ordinal` and `day_of_week` values point to the second day of the\nmonth and this `day_offset` value is set to `3`, the patch deployment takes\nplace three days after the second Tuesday of the month. If this value is\nnegative, for example -5, the patches are deployed five days before before\nthe second Tuesday of the month. Allowed values are in range \\[-30, 30\\]."]]