Performance Testing or Stress testing is sending through a heavy load of normal traffic
(either high volume or large size payload). There is no prohibition against this type of testing
in Apigee. This traffic will be counted against any API call budget or limits the
customer may have in their agreement.
In order to best support the customer, Apigee appreciates being notified prior to these tests.
To notify Apigee operations of your planned performance testing, open a Support ticket at
least 14 days before the start of testing and provide the following information:
Test Plan
What will be tested (Destination URLs and IP addresses)?
What is the Source (IP addresses) of the test traffic?
Duration of the test window (start & Stop date/time/Timezone).
Tester Info
Who will be doing the testing?
Contact details for the tester.
Test Limits
Is there an upper limit to the testing? A max TPS?
Is there a max payload size for the test?
We do not have a team dedicated to monitoring customer environments during load
testing activities. Feel free to conduct your testing and raise cases with the appropriate
priority should you face any issues.
P1 - for production impacting issues severely affecting live API traffic
P2 - for issues that have significant user impact, but the production API traffic is unaffected
[[["Easy to understand","easyToUnderstand","thumb-up"],["Solved my problem","solvedMyProblem","thumb-up"],["Other","otherUp","thumb-up"]],[["Hard to understand","hardToUnderstand","thumb-down"],["Incorrect information or sample code","incorrectInformationOrSampleCode","thumb-down"],["Missing the information/samples I need","missingTheInformationSamplesINeed","thumb-down"],["Other","otherDown","thumb-down"]],["Last updated 2025-03-10 UTC."],[[["Performance or stress testing is permitted in Apigee, involving high-volume or large-payload traffic that will count against any API call budgets."],["Apigee requests notification at least 14 days prior to testing, via a Support ticket, including details on the test plan, tester information, and test limits."],["The test plan should include the destination URLs and IPs, the source IPs, and the test window's duration."],["Apigee does not actively monitor customer environments during load testing, but support tickets can be raised if any issues are faced."],["There are three levels of support ticket priorities, P1 for production issues, P2 for significant impact, and P3 for non-critical issues."]]],[]]